GAOA High Sierra Ranger Station Upgrades, Sierra National Forest
- Response deadline
- Oct 1, 2026 Due in 7 days
- Date posted
- Sep 23, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0103 is issued as a Request for Quotation (RFQ) for the High Sierra Ranger Station Upgrades on the Sierra National Forest. This project is to provide the following prefab structures: Two new Forest Service Barracks, one kitchen/ laundry room, and one pit toilet at the High Sierra Ranger Station, reconstruction of one generator shed at the Wishon Work Center, and one pole barn at the Auberry Work Center on the High Sierra Ranger District. There is an existing footprint for the generator shed that is to be utilized in its construction. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 236220. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency. 9/21/26: Amendment 01 posted. Summary - Quote due date has been extended. 9/23/26: Amendment 02 posted. Summary - Contains site visit information, questions and answers, changes to the wage determination, Schedule of Items, and additional Attachments.
Classifications
Documents (11)
- C04 Attachment 1-Solicitation HS Upgrades.pdf.pdf1006 KBNot yet available
- C05 Amend 02 Attach 6 - DBA WD CA20260018.pdf.pdf29.2 MBNot yet available
- C04 Attachment 3-Specifications HS Upgrades.pdf.pdf829 KBNot yet available
- C05 Amendment 02 High Sierra Upgrades.pdf.pdf977 KBNot yet available
- C05 Amend 02 Attachment 2-SOI High Sierra.xlsx.xlsx14 KBNot yet available
- C05 Amend 02 Attachment 7 - ASCE Design Criteria.pdf.pdf742 KBNot yet available
- C04 Attachment 6-DBA WD CA20260018 071426.pdf.pdf29.2 MBNot yet available
- C04 Attachment 2-SOI High Sierra Upgrades.xlsx.xlsx14 KBNot yet available
- Amendment 01 High Sierra Upgrades.pdf.pdf83 KBNot yet available
- C04 Attachment 5-Fire Plan HS Upgrades.pdf.pdf565 KBNot yet available
- C04 Attachment 4-Drawings HS Upgrades.pdf.pdf3.5 MBNot yet available
Contacts
Similar contracts
- Community Living Center Phase 2 (Minor) Construction - Columbia - Project 589-404Due Oct 2, 2026
- USMS Security Upgrades at the El Centro CourthouseCaliforniaDue Oct 8, 2026
- CBP San Ysidro LPOE Glass Enclosure InstallationsCaliforniaDue Oct 8, 2026
- CBP Tecate LPOE NB Pedestrian Walkway Canopy Heating and Lighting ProjectCaliforniaDue Oct 8, 2026
- CON NRM 531-25-102 | Expand Emergency RoomIdahoDue Oct 30, 2026
- Repair Bldg. 111 Concrete Facade 695-22-121 IFBWisconsin