Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use
- Response deadline
- Sep 12, 2026 Due in 7 days
- Date posted
- Sep 4, 2026
- Source
- Open notice
Description
THIS IS A SOURCES SOUGHT NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSAL. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS, OR DRAWINGS AVAILABLE AT THIS TIME. The purpose of this sources sought notice is to determine if there is commercially available programmable automation controllers with equivalent specifications of the Schneider EcoStruxure programmable building automation controllers as detailed in Attachment 2 – Technical Information. The attachment describes the required programmable building controller requirements for the NAS Fallon DDC System. This is a market research tool being used to determine the availability and adequacy of potential sources prior to determining the method of acquisition and issuance of an award. The Government is not obligated to and will not pay for any information received from potential sources as a result of this synopsis. It is requested that interested vendors submit to the contracting office a brief capabilities statement package (no more than 5 pages total) demonstrating the ability to provide the product with the specifications described above. Interested Sources are invited to respond to this Source Sought by completing Attachment 1 – Company Information and Attachment 2 – Technical Information. The Capabilities Statement Package shall not exceed 5 pages and shall ONLY be submitted electronically to Brandon Sorensen at brandon.sorensen@navy.mil and MUST be limited to a 4MB attachment. You are encouraged to request a read receipt or acknowledgement via reply email. RESPONSES ARE DUE NO LATER THAN 11:59 PM Pacific Daylight Time 11 Sep 2026. LATE RESPONSES WILL NOT BE CONSIDERED.
Classifications
- NAICS334512
Documents (2)
- Attachment 1 Company Information.docx.docx23 KBNot yet available
- Attachment 2 Technical-Info.docx.docx20 KBNot yet available
Contacts
Similar contracts
- Source Sought NoticeAndalusiaDue Sep 17, 2026
- Warming Units for PatientsDue Sep 8, 2026
- Indicator, PressureDue Sep 8, 2026
- Dampener, Fluid PresDue Sep 8, 2026
- N--Nifc Bas Maintenance & Upgrades
- Warming Units for PatientsDue Sep 1, 2026