127EAW26Q0037 - Dark Canyon Culvert Repair
- Response deadline
- Aug 25, 2026 Due in 7 days
- Date posted
- Aug 18, 2026
- Source
- Open notice
Description
127EAW26Q0037 - Dark Canyon Culvert Repair: A00002 - RFI Responses The purpose of this amendment is to post RFI responses. Attached is "127EAW26Q0037 - RFI Form" which is hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.. ///////////////////////////////////////////////////////////////////////////////////////////// 127EAW26Q0037 - Dark Canyon Culvert Repair: A00001 - Road Use Permit The purpose of this amendment is to post and an extended road use permit to 25 August 2026. Attached is "DARK_CANYON_FS_7700_48 Road Use Permit_SIGNED" which is hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive. ///////////////////////////////////////////////////////////////////////////////////////////// 127EAW26Q0037 - Dark Canyon Culvert Repair Set Aside: Total Small Business Set Aside IMPORTANT NOTES: - See Section "Required Quote Submission Documents" for the Documents to Submit with Your Proposal - An organized site visit will NOT be held. See page 13 for complete site access details. - Requests For Information (RFI’s) are required to be submitted on attachment “RFI Form” and are due to the Contracting Officer (Gregory.Cunningham@usda.gov) via email no later than August 14th, 2026, 10:00 AM Pacific Time. No questions will be accepted after this date and time. - All quotes shall be emailed to the Contracting Officer (Gregory.Cunningham@usda.gov) no later than August 25th, 2026, 10:00 AM Pacific Time.
Classifications
Documents (14)
- 3. Dark Canyon Drawings (07-23-26).pdf.pdf3.0 MBNot yet available
- 2. Schedule of Items.docx.docx18 KBNot yet available
- 5. Wild-Mad Road Closure Map.pdf.pdf1.5 MBNot yet available
- 4. Dark Canyon Specs (07-23-26).pdf.pdf6.5 MBNot yet available
- A00001 - Road Use Permit.pdf.pdf273 KBNot yet available
- 9. Davis-Bacon Act WD # CA20260007 – 18 May 2026.pdf.pdf174 KBNot yet available
- 1. Statement of Work.pdf.pdf367 KBNot yet available
- 127EAW26Q0037 - Dark Canyon Culvert Repair.pdf.pdf590 KBNot yet available
- 6. Fire Plan.pdf.pdf339 KBNot yet available
- A00002 - RFI Responses.pdf.pdf539 KBNot yet available
- DARK_CANYON_FS_7700_48 Road Use Permit_SIGNED.pdf.pdf252 KBNot yet available
- 8. Contract Administration Information.pdf.pdf278 KBNot yet available
- 10. RFI Form.xlsx.xlsx13 KBNot yet available
- 7. Wild Mad_DARK_CANYON_FS_7700_48 Road Use Permit_Signed.pdf.pdf197 KBNot yet available
Contacts
Similar contracts
- FY26 MOTSU BermsDue Aug 24, 2026
- 27-30 Inch Maintenance Dredging within the Geographical Boundaries of USACE Mobile DistrictDue Aug 20, 2026
- USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CADue Sep 10, 2026
- San Rafael Creek and ATF FY26 Maintenance DredgingDue Sep 2, 2026
- Maintenance Dredging at Various Locations, Tyndall AFB, FLDue Sep 2, 2026
- Z2LZ--528A7-25-502 Replace Trench DrainsDue Aug 24, 2026