Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Including Beneficial Use Within CWPPRA Sabine Cycle 6 Marsh Creation Areas, Calcasieu and Cameron Parishes, LA ED 23-024
- Response deadline
- Sep 16, 2026 Closed
- Date posted
- Aug 17, 2026
- Source
- Open notice
Description
THIS SOLICITATION IS ISSUED AS UNRESTRICTED. THE NAICS CODE FOR THIS PROCUREMENT IS 237990. THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $25,000,000 AND $100,000,000. THE WORK CONSISTS OF REMOVAL OF MATERIAL FROM WITHIN THE CALCASIEU RIVER SHIP CHANNEL AND SATISFACTORY DISPOSAL WITHIN THE DESIGNATED MARSH CREATION AREAS WITHIN THE SABINE NATIONAL WILDLIFE REFUGE AND ADJACENT TO THE CALCASIEU RIVER AND PASS; ALL AS SHOWN ON THE DRAWINGS. REMOVAL OF MATERIAL FROM WITHIN DEVIL’S ELBOW IS INCLUDED AS OPTIONAL WORK. THE WORK ALSO INCLUDES RETENTION DIKE CONSTRUCTION, SURVEYS, AND OPTIONAL DITCHING AND DRAINING OF DISPOSAL AREAS, AND ALL OPERATIONS INCIDENTAL THERETO. (THE ESTIMATED TIME OF COMPLETION IS 300 CALENDAR DAYS FOR BASE WORK AFTER RECEIPT OF NOTICE TO PROCEED. THE SOLICITATION WILL INCLUDE 55 DRAWINGS AND SPECIFICATIONS).
Classifications
Documents (2)
- Solicitation Package W912P826BA023 17-AUG-2026.pdf.pdf6.0 MBNot yet available
- W912P826BA023_Advertised_Plans.pdf.pdf32.7 MBNot yet available
Contacts
Similar contracts
- LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)LouisianaDue Oct 27, 2026
- Industry Day - Selma AL Flood Management Risk and BankAlabamaDue Oct 28, 2026
- Section 219 Chesterton Interceptor Rehab
- Camp Wooten/Starbuck Levee RehabWashingtonDue Oct 30, 2026
- Sources Sought: Liberty State Park Ecosystem Restoration Project, Jersey City, NJNew JerseyDue Oct 30, 2026
- Sources Sought Wood River Relief Wells ConstructionDue Oct 28, 2026