Wave Waterpark Restroom Remodel Project
- Response deadline
- Nov 17, 2026 Due in 20 days
- Date posted
- Oct 27, 2026
- Source
- Open notice
Description
The Work generally consists of: Demolition and removal of the existing sinks, faucets, toilets, urinals, toilet partitions, countertops, and light fixtures; installation of new commercial-grade, water-conserving lavatories, toilets, urinals, and flush valves; new solid plastic or phenolic toilet partitions and urinal screens; new solid-surface or quartz countertops; new damp-rated LED lighting with occupancy controls; and surface preparation and painting of walls, ceilings, doors, and frames with a moisture-resistant coating system. The Work also includes demolition and installation of drywall, framing, and associated finishes, as well as the remodeling of the existing trellis structure and the replacement and installation of water heaters.
Documents
No documents posted for this opportunity.
Similar contracts
- Brengle Terrace Park Ballfield Renovation ProjectCADue Jul 28, 2026
- As-Needed Asphalt, Sidewalk, Curb and Gutter Restoration ServicesCADue Jul 23, 2026