Civic AI
Civic AI
Procurement intelligence
OpenGov / Ionwave96zwqd7mdnf
Open

Wave Waterpark Restroom Remodel Project

Response deadline
Nov 17, 2026
Due in 20 days
Date posted
Oct 27, 2026

Description

The Work generally consists of: Demolition and removal of the existing sinks, faucets, toilets, urinals, toilet partitions, countertops, and light fixtures; installation of new commercial-grade, water-conserving lavatories, toilets, urinals, and flush valves; new solid plastic or phenolic toilet partitions and urinal screens; new solid-surface or quartz countertops; new damp-rated LED lighting with occupancy controls; and surface preparation and painting of walls, ceilings, doors, and frames with a moisture-resistant coating system. The Work also includes demolition and installation of drywall, framing, and associated finishes, as well as the remodeling of the existing trellis structure and the replacement and installation of water heaters.

Documents

No documents posted for this opportunity.

Similar contracts

Explore more