ca_la_metroOP141432
Open
Union Station Gateway (USG) Data Center HVAC and Power Improvement. Amendment 1, 2, 3, 4, 5, 6, 7and 7, 8added. Q&A 1, 2, 3, 4 and 5 added. update 9/29/2026
LA Metro (LACMTA) · CA
- Response deadline
- Oct 23, 2026 Due in 7 days
- Date posted
- Jun 11, 2026
- Source
- Open notice
Description
LA Metro is seeking a qualified contractor to furnish all labor, materials, equipment and services necessary to complete data center and HVAC power improvements at Union Station Gateway (USG). The selected contractor will upgrade Power Distribution Units (PDUs), the HVAC cooling system and electrical power distribution, lighting control systems and associated infrastructure with modern, energy efficient equipment. All systems shall be designed and installed to meet current industry-standard redundancy for reliability.
Documents (1)
- Download Solicitation Fileapplication/x-zip-compressed8.3 MBNot yet available
Contacts
Similar contracts
- 200220 Transceiver - Box, Train Mounted Trx, 18-75 Vdc, Protracker, Protran, P30CADue Jul 13, 2026
- Driveshaft asm, element, sensorCADue Jul 9, 2026
- Mop Head - 20Oz. Rayon, Cut End, 1-1/4" Headband to Be Used with Quick Change HaCADue Jul 10, 2026
- Cone - Caution 36" Yellow, Multilingual, Safety ConeCADue Jul 10, 2026
- Harness - Regulator, Sensing, Niehoff, J1939, 28 Volt, Nabi 8100-8400 & 9200-949CADue Jul 9, 2026
- Camera - Axis, High Performance, 4Mo W/30X ZoomCADue Jul 8, 2026