ca_la_metroOP143067
Open
Train Control Infrastructure Predictive Analytics System. Clarification 1 added. Pre-Proposal Documents added. update 8/14/2026
LA Metro (LACMTA) · CA
- Response deadline
- Sep 21, 2026 Due in 36 days
- Date posted
- Aug 6, 2026
- Source
- Open notice
Description
This Scope of Work (SOW) is intended to engage a qualified vendor responsible for providing a solution to include design, supply of hardware and associated accessories, training, and testing of an integrated system, hereinafter referred to as the "Predictive Analytics System" (PAS) project. Please refer to Exhibit A- Scope of Work for detailed project requirements.
Documents (1)
- Download Solicitation Fileapplication/x-zip-compressed8.1 MBNot yet available
Contacts
Similar contracts
- HARNESS - REGULATOR, SENSING, NIEHOFF, J1939, 28 VOLT, NABI 8100-8400 & 9200-949CADue Jul 9, 2026
- Dipstick, harness, hoseCADue Jul 9, 2026
- 200220 TRANSCEIVER - BOX, TRAIN MOUNTED TRX, 18-75 VDC, PROTRACKER, PROTRAN, P30CADue Jul 13, 2026
- Driveshaft asm, element, sensorCADue Jul 9, 2026
- CAMERA - AXIS, HIGH PERFORMANCE, 4MO W/30X ZOOM,CADue Jul 8, 2026
- SOCKET - 30MM, HPT, SNAP ON, SHORTENEDCADue Jul 8, 2026