Civic AI
Civic AI
Procurement intelligence
OpenGov / Ionwave11962.66 TP-1004
Open

Trade Package - Design-Build Services for the Wayfinding Enhancement Program Phase 2 - TP-1004 - Metals - Signage Metal Frames

San Francisco Airport (Construction) — Design-Builder · CA
Response deadline
Jul 4, 2026
Closed
Date posted
Jun 19, 2026

Description

Design-Builder Firm Name: Swinerton/Corgan Project Overview: Install new digital and static wayfinding elements with supporting metal frames and power and data for (9) Airtrain Stations. Project will be let out in (2) Packages. Package #1 involves (4) Stations and Package #2 involves the remainder (5) Stations. Trade Package No.: TP-1004 Trade Package Title: Metals -Signage Metal Frames Description of the Trade Package Scope of Work: Furnish and Install metal frames for static static signs Trade Package Bid Due Date and Time: This advertisement is for Prequalification only - due date 7/3/26 Estimated Cost : $400000 Main Trades of the Trade Package: Architectural Steel Frames CMD LBE Participation Requirement: 50% Design-Builder requirements or prequalification criteria: Prequalification with Swinerton required If you are not prequalified please use the this link; https://swinerton.com/subcontractor-prequalification/ Contact for Trade Package information: Bob Deasy; robert.deasy@swinerton.com Design-Builder web link to the Trade Package or more information: https://swinerton.com/subcontractor-prequalification/

Documents

No documents posted for this opportunity.

Explore more