Trade Package - Cargo Building 626.1 - TP 0035 - SFO Cargo 626 Material Handling System Installation
- Response deadline
- Sep 18, 2026 Due in 14 days
- Date posted
- Sep 3, 2026
- Source
- Open notice
Description
Design-Builder Firm Name: Clark Construction Project Overview: The Airport has a series of cargo buildings at the end of their useful life. The scope of this project is a core-and-shell 2-story cargo building with associated leasable office space mezzanine and improved sidewalk and landscaping elements. All interior fit-out work to be by future tenant. Phase 1 (626.1) Scope includes cargo warehouse space spread across two floors, 28 truck docks, 7 future truck docks, structural accommodations for material handling systems such as an elevating transfer vehicle (ETV), office space with light wells and two parking stalls, both of which are handicap accessible. The ware house facade is primarily insulated metal panel with glass and translucent polycarbonate with a durable concrete base. The office facade is primarily glass and metal panel with a glass and concrete base. The project is served by two elevators per phase. Prior to occupancy, demolition of building 624 and relocation of some existing infrastructure such as an existing vault and pad-mounted equipment will be performed. Trade Package No.: TP-0035 Trade Package Title: SFO Cargo 626 Material Handling System Installation Description of the Trade Package Scope of Work: Scope of work includes mechanical installation of the Material Handling System. Trade Package Bid Due Date and Time: 09/18/2026 2pm CMD LBE Participation Requirement %: 5% Main Trades of the Trade Package: Material Handling System Installation Best contact for Trade Package information (Name and Email): Nicolette Madonna, nicolette.madonna@clarkconstruction.com
Documents
No documents posted for this opportunity.
Similar contracts
- Trade Package - SFO Boarding Area F Refresh Project - TP 02 - Core Trade Design Build - Electrical & Special SystemsCADue Sep 9, 2026
- Terminal 3 West Modernization - TP 173- East Exterior WallCADue Sep 15, 2026
- Trade Package - West Field Garage 675 - TP 10.10 - PaintingCADue Aug 14, 2026
- Trade Package - West Field Garage 675 - TP 10.10 - PaintingCADue Aug 3, 2026
- Terminal 3 West Modernization - TP 246 - East: Sitework and Site UtilitiesCADue Aug 11, 2026
- Trade Package - Design-Build Services for the Wayfinding Enhancement Program Phase 2 - TP-1004.1 - MetalsCADue Jul 18, 2026