Civic AI
Civic AI
Procurement intelligence
la_rampla232951
Open

TOS No. 105 - Baldwin Vista Green Streets Project

Response deadline
Jan 5, 2027
Due in 56 days
Date posted
Nov 9, 2026

Description

The City of Los Angeles, Bureau of Engineering (BOE) in conjunction with LA Sanitation & Environment (LASAN) is seeking a consultant to provide the scope of work for the Baldwin Vista Green Streets Project (Project). The scope of work includes pre-design, design, environmental coordination, bid & award, community outreach, and design services during construction. The Project will capture and infiltrate dry and wet weather flow to assist in meeting water quality regulatory requirements and to provide community enhancement features. The LASAN is the developer and owner of the Project. This TOS is being issued by the BOE in conjunction with LASAN. *Any subconsultants that have been added to the contract and not originally a part of Schedule A must be registered with RAMP. **This TOS is only applicable to the firms on the Pre-Qualified On-Call Wastewater and Environmental Engineering Services Consultants List.

Classifications

Documents (14)

  • Attachment M - Non-Collusion Affidavit.pdf
    PDF14 KBNot yet available
  • Attachment C - Community Outreach and Engagement Program (COEP).pdf
    PDF51 KBNot yet available
  • Attachment K - Storm Drain Design Plan Submittal Checklist.pdf
    PDF380 KBNot yet available
  • Attachment H - Measure HLA.pdf
    PDF285 KBNot yet available
  • Attachment A - Baldwin Vista Green Streets Project SCW Feasibility Study Report.pdf
    PDF50.0 MBNot yet available
  • Attachment F - LASAN Clean Water Standard Design Guidelines for O&M.pdf
    PDF669 KBNot yet available
  • Attachment L - Task Work Order List of Subconsultants Form (Schedule B).xls
    EXCEL49 KBNot yet available
  • Attachment J - Regional Transfer Agreement.pdf
    PDF569 KBNot yet available
  • Attachment E - Measure W Sign Design Guidelines.pdf
    PDF24.4 MBNot yet available
  • Attachment I - Special Order No. 04-0222.pdf
    PDF814 KBNot yet available
  • Attachment G - Stormwater Project Design Review and Comment Process.pdf
    PDF551 KBNot yet available
  • Attachment D - StreetsLA Design Guidelines.pdf
    PDF926 KBNot yet available
  • Attachment B - Baldwin Vista Green Streets Project Regional Program Scope of Work.pdf
    PDF3.8 MBNot yet available
  • TOS No. 105 - Baldwin Vista Green Streets Project.pdf
    PDF918 KBNot yet available

Contacts

Similar contracts

Explore more