Civic AI
Civic AI
Procurement intelligence
SAM.govFA461026QSDSP2
Open

Storm Drain Study Cantonment Area Phase 2

Response deadline
Aug 11, 2026
Due in 17 days
Date posted
Jul 22, 2026

Description

RFI Questions due NLT 30 July 2026 by 1400 PDT. Quotes due NLT 11 August 2026 by 1400 PDT. The requirement is for a contractor to provide all management, labor, tools, equipment, and materials necessary to perform a comprehensive cleaning, CCTV video inspection, and GIS survey of the storm drain system at Vandenberg Space Force Base, California, within 365 days of contract award. This follow-on effort is critical to assessing infrastructure condition, ensuring continuous operational integrity, and preventing system failures that could cause flooding or environmental damage. Work must be executed in accordance with prevailing industry and government standards, including NASSCO Pipeline Assessment Certification Program guidelines, UFGS TV inspection specifications, and base CAD standards. Due to the active military installation setting, the contractor must strictly adhere to security access controls, background checks, and environmental compliance protocols, including biological monitoring for the protected Vernal Pool Fairy Shrimp. Additionally, the contractor must coordinate all material and sludge disposal with the 30CES/CEI Waste Compliance office and remain prepared for potential unexploded ordnance (UXO) monitoring during field operations. See PWS for additional information.

Classifications

Documents (11)

  • Attach. 10 - SCA WD 2015-5647 Rev. 27_20260513.pdf
    .pdf4.2 MBNot yet available
  • Attach. 2 - Storm Drain Study Pricing Schedule.xlsx
    .xlsx25 KBNot yet available
  • Attach. 5 - Appendix C VSFB Front End Specification.pdf
    .pdf2.0 MBNot yet available
  • Attach. 9 - Clauses and Provisions.pdf
    .pdf132 KBNot yet available
  • Attach. 4 - Appendix B Carsonite Marker Catalog Cutsheet.pdf
    .pdf1023 KBNot yet available
  • Attach. 3 - Appendix A Location of Storm Drain Survey Area.pdf
    .pdf1.6 MBNot yet available
  • Attach. 7 - Appendix E XUMU181025B2 Previous Storm Drain Study.pdf
    .pdf50.0 MBNot yet available
  • Attach. 8 - Appendix G AF Form 813.pdf
    .pdf2.0 MBNot yet available
  • Attach. 6 - Appendix D UFGS 33 01 30.16 TV Inspection of Sewer Lines.pdf
    .pdf255 KBNot yet available
  • Storm Drain Study Phase II_Combo RFQ.pdf
    .pdf182 KBNot yet available
  • Attach. 1 - PWS_Survey Storm Drains Phase 2.pdf
    .pdf1.1 MBNot yet available

Contacts

Similar contracts

Explore more