Space Data Network (SDN) Mission Operations Center Commercial Solutions Opening (CSO)
- Response deadline
- May 18, 2026 Closed
- Date posted
- May 6, 2026
- Source
- Open notice
Description
6 MAY 2026 UPDATE: Amendment 1 to the CSO Posted The Government desires a MOC design and implementation approach that will seamlessly integrate the entire SDN-B architecture with modularity for future expansion: commercial proliferated low Earth orbit (pLEO) providers, government/commercial transport, ground elements, and Space Exchange Points (SEPs). The SDN-B MOC will be the centralized hub that �brokers� user services, mission plans, and resources. It will deliver enterprise-wide situational awareness and a common operational picture of all SDN ground and space assets. The MOC requires a hybrid deployment, utilizing both an on-premises and cloud-based hardware and software to provision, orchestrate, control, and manage the network transport services. It will serve as the primary interface for processing user service requests and ensures end-to-end service performance by monitoring the health, status, and performance of all SDN network elements. The MOC will operate as a Government-Owned, Contractor-Operated (GOCO) facility, designed with a Modular Open Systems Approach (MOSA) to ensure future adaptability and integration. See attached PDF file for further details.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Lunar Enabling Infrastructure Accelerator (LEIA) -Broad Agency Announcement (BAA) NextSTEP-3 Appendix A - Final SolicitationDue Oct 15, 2026
- Atomically Precise Molecules (APM)Due Dec 18, 2026
- 2027 NIAID DMID Omnibus Broad Agency Announcement: Development of Medical Interventions for Infectious DiseasesDue Dec 8, 2026
- MTEC Solicitation Summary: Fiscal Year 2026 Multi-Topic Request for Project ProposalsMarylandDue Oct 30, 2026
- Pioneering Aerospace Capabilities, Engineering and ResearchDue May 10, 2031
- Mobile Integrated Launch CapabilityAlabamaDue Sep 30, 2028