Sidewalk Repair Program Package No. 85 (La 28)
- Response deadline
- Aug 19, 2026 Closed
- Date posted
- Jul 16, 2026
- Source
- Open notice
Description
This project is a Design-Bid-Build construction project to remediate existing pedestrian facilities and bring them into compliance with current ADA standards at a total of 22 sites: 15 Access Request sites & 7 LA28 Program Access Improvements (PAI) sites. The scope of work includes Sidewalk, driveway, curb & gutter replacement; Curb ramp installation; Remodel catch basin lid; AC patch repair; Concrete intersection gutter repairs; Remove & reinstall water meters; Adjust utility boxes & vaults to grade; Relocate fire hydrants. Remove & reinstall bus bench Remove & re-install pedestrian pipe guardrail/handrail, Tree work & landscape restoration; ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
Classifications
- NAICS237310
- PSCConstruction
Documents (3)
Contacts
Similar contracts
- Z--St. Marks NWR Aucilla Tram Road Bridge DBDue Oct 19, 2026
- AZ BL COLO 7528(1) Burro Creek RoadArizonaDue Nov 17, 2026
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadUtahDue Nov 10, 2026
- Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1)New YorkDue Dec 1, 2026
- HI FLAP CR562(1) Kilauea PointHawaii
- Repair Storm Damage Imperial Dam Road at YPG, AZDue Oct 21, 2026