San Luis Obispo (SBP) ATCT Roof Replacement
- Response deadline
- May 19, 2026 Closed
- Date posted
- May 7, 2026
- Source
- Open notice
Description
The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: � Remove and dispose of existing roofing system from the SBP ATCT cab roof. � Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. � Remove and replace all roof drains. � Remove and replace roof hatch � Remove and relocate grounding counterpoise from roof to parapet wall. � Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- 671-24-004 NRM Replace 2nd Floor RoofDue Oct 13, 2026
- GAOA Remove and Replace Roofing on Island Park Admin Site Housing UnitsIdahoDue Oct 30, 2026
- Replace Roof and Hatches, ITO ATCT, Hilo, HawaiiHawaiiDue Oct 16, 2026
- Commercial Roof Replacement (Fort Worth, TX)TexasDue Sep 30, 2026
- Disa Fy26 Roof Repairs at Fort Meade, MarylandDue Oct 9, 2026
- Proj. 561A4-26-501 Replace Roof Building 143 at VA NJ Lyons Design-Build