San Luis Obispo (SBP) ATCT Roof Replacement
- Response deadline
- Jun 16, 2026 Closed
- Date posted
- May 31, 2026
- Source
- Open notice
Description
The Subcontractor shall furnish all labor, materials, equipment, supervision and all other services required to replace the roof at ATCT at SBP. Attached drawings are for reference only, Approximate quantities ATCT Cab roof 361 sq. ft. The scope of work includes but not limited to: � Remove and dispose of existing roofing system from the SBP ATCT cab roof. � Provide and install roof hatch guardrail kit with self closing gate, galvanized finish. to meet code compliance. � Remove and replace all roof drains. � Remove and replace roof hatch � Remove and relocate grounding counterpoise from roof to parapet wall. � Remove debris and trash generated from work and dispose of the debris per local and state requirements, daily.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Roof Repairs - National Center for Cool and the Cold-Water Aquaculture (NCCCWA)West VirginiaDue Aug 17, 2026
- Air Traffic Control Tower & Base Building Waterproofing & Exterior Restoration ProjectFloridaDue Sep 8, 2026
- Roof Repair B9502 McGregor RangeTexasDue Aug 26, 2026
- Removal, Inspection, & Replacement Roofing - 3 remote Forest Service locationsArizonaDue Sep 10, 2026
- Free Quaker Meeting House, Roof Repair, ConservatiDue Sep 11, 2026
- Gold Beach Ranger Station Roof ReplacementsOregonDue Aug 28, 2026