Pre-Qualification for Prima Zone 4 Phase A Main Gas Line Project
- Response deadline
- Sep 18, 2026 Closed
- Date posted
- Sep 2, 2026
- Source
- Open notice
Description
The project consists of design, permitting, and construction of the Zone 4 Phase A Landfill Gas (LFG) Collection and Control System (LFGCCS) header installation. Work to include trenching, installation of new HDPE header piping, associated valves and appurtenances, tie-ins to existing LFG infrastructure, backfilling, testing, and restoration of disturbed areas. Contractors should account for site constraints including traffic control, construction sequence, coordination with landfill operations, subcontractor scheduling, and materials procurement. Completed work will provide the owner with improvements to the LFGCCS, including the fully installed Zone 4 Phase A header and associated connections to the existing LFG infrastructure, with the requirement that the contractor avoid damage to any existing infrastructure not designated for demolition and removal.
Documents
No documents posted for this opportunity.
Similar contracts
- Bird Control SuppliesCADue Nov 10, 2026
- TVA 2020 Toxic Vapor AnalyzerCADue Nov 6, 2026
- Organic DefoamerCADue Nov 6, 2026
- DBB Prima Zone 4 Phase A Main Gas Line ProjectCADue Oct 13, 2026
- Greenery Equipment Maintenance & Repair ServicesCADue Oct 13, 2026
- Automatic Tarping MachinesCADue Sep 30, 2026