Civic AI
Civic AI
Procurement intelligence
la_rampla230918
Open

Pico Boulevard Safety and Mobility

Response deadline
Aug 26, 2026
Due in 11 days
Date posted
Jul 23, 2026

Description

Project includes restriping of Pico Boulevard between Crenshaw Boulevard and L.A. Live Way to reduce vehicle lanes and provide a bicycle facility (Class IV) and pedestrian safety measures. Pico is a Vision Zero priority corridor and is also identified as an Olympics-serving corridor that will connect people to venues in DTLA. The purpose of the project is to improve safety on Pico Boulevard and improve the bicycle network. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/

Classifications

Documents (5)

  • E1909474_Bid_Pkg_Part_2.zip
    ZIP50.0 MB
    Download
  • E1909474_Bid_Pkg_Part_1.zip
    ZIP27.5 MB
    Download
  • E1909474_Bid_Pkg_Part_3.zip
    ZIP31.5 MB
    Download
  • E1909474_Addendum_1.zip
    ZIP3.8 MB
    Download
  • E1909474_Info.pdf
    PDF124 KB
    Download

Contacts

Similar contracts

Explore more