OpenGov / IonwaveSS2202
Open
Oyster Point Sanitary Sewer Pump Station Relocation
- Response deadline
- Nov 5, 2026 Due in 34 days
- Date posted
- Oct 1, 2026
- Source
- Open notice
Description
General work description: The work consists of relocating and upgrading the existing vacuum and ejector pump station to a traditional pump station, relocating the electrical switchgear cabinet that serves the eastern half of the marina, installing new ejector pumps at each marina facility, installing new collection force main system, installing a new pump ahead on the public dock, decommissioning the existing pump station, and abandoning the existing vacuum main system. The project is located at the Oyster Point Marina in South San Francisco, CA. The Engineer’s Estimate for the project is $5.16M. A detailed scope of work is included in the bid documents.
Documents
No documents posted for this opportunity.
Similar contracts
- Telford and Park Way Crossing EnhancementsCADue Sep 2, 2026
- WQCP Clarifier Concrete RepairsCADue Aug 7, 2026