Civic AI
Civic AI
Procurement intelligence
California eProcure0000039497
Open

Mono Lake ADA Boardwalk Materials

Dept of Parks & Recreation · CA
Response deadline
Jul 9, 2026
Closed
Date posted
06/16/2026 12:00PM PDT

Description

Version 5 Addendum 3 includes the notice of intent to award. Version 4 Addendum 2 includes answers to questions and provides an Excel spreadsheet from Attachment 2 ¿ Technical Requirements/Statement of Work (page 2) Version 3 Addendum 1 includes updates to Key Dates Contractor to provide materials for the replacement of the Mono Lake ADA boardwalk trail. Boardwalk materials to be composed of fiber reinforced polymer (FRP) composite materials and manufactured using continuous ECR glass fiber and vinyl ester resin. All structural members will have non-woven polyester veil applied during the manufacturing process. Due to strict scenic corridor constraints and a high alkaline and UV exposure environment, FRP materials must be painted in a two-part fluoropolymer coating such as Vitreflon or approved equal and must be RAL 080-30-26 (Smoked Oak) in color. The boardwalk required is 740 lineal feet and 6 feet width outside to outside. Decking required is to be 38mm mini-mesh decking with anti-slip surface and in panels 4 feet by 6 feet by 1.5 inches thick. Bull rail edging to attach flush with outside of decking for total of 6-foot-wide decking surface. Hardware and brackets to be stainless steel and provided in full to connect all boardwalk materials directly to concrete Diamond Pier foundation, provided by Parks, and construct entire boardwalk structure. Due to sensitive wetland environment, spans between Diamond Pier foundations need to be 20 foot and engineered for 100 psi live load.

Classifications

  • UNSPSC30103200Construction structural components & basic shapes - Grating

Documents (9)

  • Attachment_1_-_Agreement_Cover_Letter_S25683109.pdf
    162 KB
    Download
  • Attachment_3_-_Cost_Worksheet_S25683109.xlsx
    14 KB
    Download
  • Attachment_4_-_Narrative_Response_S25683109.docx
    16 KB
    Download
  • Attachment_2_-_Technical_Requirements-Statement_of_Work.docx
    113 KB
    Download
  • ADDENDUM__1__notice_VER_3.docx
    75 KB
    Download
  • Amendment_3_Ver._5_Notice_of_Intent_to_Award.pdf
    485 KBNot yet available
  • ADDENDUM__2__notice_VER_4_BoM_spreadsheet.xlsx
    12 KB
    Download
  • IFB-Mono_Lake_ADA_Boardwalk_Materials_S25683109_Addendum_1.docx
    134 KB
    Download
  • ADDENDUM__2__notice_VER_4.docx
    1.2 MB
    Download

Contacts

Explore more