MacArthur Lake Stormwater Capture Project
- Response deadline
- Aug 26, 2026 Due in 11 days
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
The MacArthur Lake Rehabilitation Project will capture, store, and treat stormwater to offset potable water used to fill the lake. The project improvements include installing a diversion structure, a primary treatment unit, pump well, several feet of reinforced concrete pipe, ductile iron pipe, a secondary stormwater treatment unit, valve and meter vaults, several maintenance holes, a new cascading water feature with retaining walls, sidewalk and walkway reconstruction, and pump house upgrades, including electrical and instrumentation systems. Improvements will be constructed both within MacArthur Park and the City Public Right of Way within the surrounding vicinity. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
Classifications
- NAICS236210
- PSCConstruction
Documents (8)
- DownloadS33WMLRP_Info.pdfPDF132 KB
- DownloadS33WMLRP_Bid_Pkg_Part_4.zipZIP35.4 MB
- DownloadS33WMLRP_Bid_Pkg_Part_1.zipZIP23.9 MB
- DownloadS33WMLRP_Bid_Pkg_Part_3.zipZIP50.0 MB
- DownloadS33WMLRP_Bid_Pkg_Part_5.zipZIP26.4 MB
- DownloadS33WMLRP_Bid_Pkg_Part_2.zipZIP30.1 MB
- DownloadS33WMLRP_Addendum_1.zipZIP3.3 MB
- DownloadS33WMLRP_Notice_to_Bidders_1.pdfPDF201 KB
Contacts
Similar contracts
- WWYK240052 Renovate Hallway, 1AB1-103C, 1AB1-108B, B3001OklahomaDue Sep 14, 2026
- WWYK240052 Renovate Hallway, 1AB1-103C, 1AB1-108B, B3001OklahomaDue Sep 14, 2026
- CONSTRUCT TOC PAD - ARLINGTON HEIGHTS IL - SolicitationIllinoisDue Sep 9, 2026
- WWYK240052 Renovate Hallway, 1AB1-103C, 1AB1-108B, B3001OklahomaDue Sep 14, 2026
- Leavenworth VA DecommissioningKansasDue Sep 14, 2026
- Tinker AFB 2026 Multiple Award Construction Contract (MACC)OklahomaDue Sep 11, 2026