Civic AI
Civic AI
Procurement intelligence
la_rampla230903
Open

MacArthur Lake Stormwater Capture Project

Response deadline
Aug 26, 2026
Due in 11 days
Date posted
Jul 23, 2026

Description

The MacArthur Lake Rehabilitation Project will capture, store, and treat stormwater to offset potable water used to fill the lake. The project improvements include installing a diversion structure, a primary treatment unit, pump well, several feet of reinforced concrete pipe, ductile iron pipe, a secondary stormwater treatment unit, valve and meter vaults, several maintenance holes, a new cascading water feature with retaining walls, sidewalk and walkway reconstruction, and pump house upgrades, including electrical and instrumentation systems. Improvements will be constructed both within MacArthur Park and the City Public Right of Way within the surrounding vicinity. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/

Classifications

Documents (8)

  • S33WMLRP_Info.pdf
    PDF132 KB
    Download
  • S33WMLRP_Bid_Pkg_Part_4.zip
    ZIP35.4 MB
    Download
  • S33WMLRP_Bid_Pkg_Part_1.zip
    ZIP23.9 MB
    Download
  • S33WMLRP_Bid_Pkg_Part_3.zip
    ZIP50.0 MB
    Download
  • S33WMLRP_Bid_Pkg_Part_5.zip
    ZIP26.4 MB
    Download
  • S33WMLRP_Bid_Pkg_Part_2.zip
    ZIP30.1 MB
    Download
  • S33WMLRP_Addendum_1.zip
    ZIP3.3 MB
    Download
  • S33WMLRP_Notice_to_Bidders_1.pdf
    PDF201 KB
    Download

Contacts

Similar contracts

Explore more