J-143 PDB (RFP), Solids Deep Well Injection
- Response deadline
- Aug 11, 2026 Closed
- Date posted
- Jun 16, 2026
- Source
- Open notice
Description
The Solids Deep Well Injection System (SDWIS) at OC SAN’s Plant No. 1 is a multiphase capital project requiring design, permitting, construction, testing, and commissioning of a new long term solids management facility. The Project includes: • Development of a full-scale deep well injection facility to potentially manage the average daily production of solids from Plant No. 1 (approximately 520 gallons per minute of digested sludge at 3-4% density) as well as flexibility for future Plant No. 2 flows (approximately 375 gallons per minute). • Permitting, design, construction and testing of an initial test well facility, delivered under a separate early GMP, to confirm injection feasibility and formation performance. • Full buildout of surface and subsurface facilities, supporting utilities, and operational systems that are integrateable with OC SAN’s existing infrastructure and treatment processes. • Preparation of permitting documents (EPA UIC, SCAQMD, local permits, etc). • Facility commissioning along with a two-year extended performance acceptance test commissioning time period. The scale of the Project spans subsurface drilling, major civil and mechanical facility construction, wastewater solids handling systems, odor control, electrical infrastructure expansion, and multi-agency regulatory coordination. Specific information on the Phase 1 Scope of Work is included in Attachment A – Phase 1 Scope of Work.
Documents
No documents posted for this opportunity.
Similar contracts
- Configurable Regulatory Program Information Management SystemCADue Dec 10, 2026
- Knott-Miller Holder Artesia Branch RehabilitationCADue Nov 16, 2026
- Industrial Facility Verification ProjectCADue Oct 26, 2026
- Truck Loading Biofilter Media Replacement at Plant No. 2 (FR2-0034)CADue Oct 20, 2026
- Biosolids Management ServicesCADue Oct 26, 2026
- HPE vSAN Ready Nodes for the Enterprise and SCADA EnvironmentCADue Sep 22, 2026