Install Concrete Pad for Metal Storage Building at Fire Station #3
- Response deadline
- Jul 29, 2026 Due in 10 days
- Date posted
- Jun 23, 2026
- Source
- Open notice
Description
Install a concrete pad and utilities for a metal storage building. The concrete must meet all specifications on the plans and will be able to hold the weight of fire apparatus of approximately 55,000 lbs each. Bidders shall be aware that electrical, above-ground fire sprinkler & building installer vendors have been selected. The following is the scope of work needed: Demolition (saw cut and removal of existing AC material) Utilities (trenching for electrical and fire sprinklers, electrical pipe installation) Concrete Pad Installation (includes subgrade preparation, form work, rebar installation, concrete pour and finish work, AC conforms, building anchorage installation) Remove existing storm drain inlet connection and install/connect new Bio-Retention Area. Bidders shall review and adhere to the following: Green Building Checklist Site management & bmps per plans Construction waste reduction, disposal and recycling Product gwp compliance Finish material pollutant control Coordinate and work with other contractors as required to execute all work listed on plans. Schedule, attend, and complete all required inspections for listed scope of work with the applicable City of Santa Cruz inspectors. All refuse and recycling activities during construction must comply with Chapter 6.12 of the Santa Cruz Municipal Code and be accounted for on the Construction Waste Management Plan. All work must comply with the building permit plans, as well as state and local codes. A bid bond is not required for the project bid. A labor and performance bond and a materials bond will be required after the project is rewarded.
Documents
No documents posted for this opportunity.