SAM.gov127EAX26Q0051
Open
GAOA Accessible Upgrades Toilet Replacement
- Response deadline
- Jul 22, 2026 Closed
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
GAOA Accessible Upgrades Toilet Replacement
Classifications
Documents (8)
- DownloadAttachment 6 Wage Determination CA20260007.pdf.pdf132 KB
- DownloadAttachment 2 Schedule of Items.pdf.pdf117 KB
- Download127EAX26Q0051 Amendment 1.pdf.pdf402 KB
- DownloadAttachment 7 Fire Plan.doc.doc252 KB
- DownloadAttachment 3 Specifications.pdf.pdf383 KB
- DownloadAttachment 4 Drawings.pdf.pdf5.9 MB
- Download127EAX26Q0051 GAOA Accessible Upgrades Toilet Replacement.pdf.pdf412 KB
- DownloadAttachment 5 Wage Determination CA20260018.pdf.pdf215 KB
Contacts
Similar contracts
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLETNew JerseyDue Nov 2, 2026
- Corinth National Cemetery, 838Cm3036 – Gravesite Expansion and Cemetery ImprovementsMississippi
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)DelawareDue Nov 2, 2026
- Mill Springs National Cemetery Gravesite ExpansionKentucky
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter), Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging within the Vicksburg DistrictMississippiDue Oct 23, 2026
- Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund SiteDue Nov 20, 2026