Engineering and Traffic Surveys Supporting the Town's Speed Limits to Continue Radar Enforcement
- Response deadline
- Nov 28, 2026 Due in 31 days
- Date posted
- Oct 27, 2026
- Source
- Open notice
Description
The California Vehicle Code requires engineering and traffic surveys be completed to support radar enforcement of prima facie speed limits for non-local streets below 65 mph and for narrow streets below 25 mph. The Town of Los Gatos needs to renew the engineering and traffic surveys supporting its speed limits to continue radar enforcement. The selected consultant shall conduct a Townwide Speed Survey and prepare an engineering evaluation and recommendations for existing speed limits on 65 Town-identified roadway segments , consisting of: 31 high-volume segments ; and 34 low-volume segments . Consultant shall review three years of accident history for each street segment. Consultant shall also drive and field check each street segment to evaluate the appropriateness of speed limits and for purpose of selecting survey location. All relevant information will be included in the report as a basis for the recommendation. Consultant shall provide field notes, full speed survey data, a summary table, and prepare a report of final recommendation. Town staff will review and sign the report of final recommendation.
Documents
No documents posted for this opportunity.
Similar contracts
- 709 University Avenue Drainage System Replacement ProjectCADue Oct 28, 2026
- Roadside Vegetation Management - USDA GrantCADue Sep 8, 2026
- Operational Audit of Town of Los Gatos FleetCADue Jul 29, 2026