Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwaveRFQ197538
Open

Colorado Transformer-21; Secondary Bushing Repair

Response deadline
Sep 23, 2026
Due in 32 days
Date posted
Aug 21, 2026

Description

The City of Palo Alto Utilities Department requires a qualified contractor to perform the removal and replacement of the gaskets on the secondary bushings of Transformer 21 at the Colorado Substation. The selected contractor shall furnish all labor, supervision, tools, equipment, materials, oil processing equipment, oil storage tanker with containment berm, testing instruments, safety equipment, transportation, hauling, disposal, and incidentals necessary to complete secondary bushing re-gasketing work on Transformer 21 at Colorado Substation. The work generally consists of pre-testing, partial draining and storage of non-PCB mineral oil, gasket replacement at the bushing flanges and any disturbed manways, pressure testing, oil processing and refill, post-testing, demobilization, and delivery of test and service documentation. The objective of this contract is to stop oil leakage and restore the integrity and service readiness of Transformer 21 at Colorado Substation in coordination with the City’s designated project manager.

Documents

No documents posted for this opportunity.

Similar contracts

Explore more