Central Business District (CBD) Sewer Rehabilitation Unit 2 - 12th & Flower to Pico & Santee
- Response deadline
- Aug 12, 2026 Due in 25 days
- Date posted
- Jul 2, 2026
- Source
- Open notice
Description
The scope of work consists of rehabilitating approximately 3,678 linear feet of existing 39-inch semi-elliptical brick sewer with Ultra-Violet Cured-in-Place Pipe (UV-CIPP) liner, constructing five (5) pits, partially removal reconstruction and rehabilitation of three (3) existing sewer maintenance holes, constructing three (3) new 48-inch maintenance holes, reconnecting a 10-inch lateral sewer, a 15-inch stub and four (4) existing house connections. Sewer inspection, sewer cleaning, debris removal and disposal, sewer bypass, traffic control, and odor control are also part of the project. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
Classifications
- NAICS237110
- PSCConstruction
Documents (5)
- SZC14157_Info.pdfPDF136 KBNot yet available
- SZC14157_Bid_Pkg_Part_1.zipZIP42.7 MBNot yet available
- SZC14157_Bid_Pkg_Part_2.zipZIP50.0 MBNot yet available
- SZC14157_Bid_Pkg_Part_3.zipZIP50.0 MBNot yet available
- SZC14157_Addendum_1.zipZIP8.2 MBNot yet available
Contacts
- Jin Wen