BROADWAY-MANCHESTER ACTIVE TRANSPORTATION EQUITY- Federal Project No. ATPL-5006(895)
- Response deadline
- Sep 30, 2026 Closed
- Date posted
- Aug 21, 2026
- Source
- Open notice
Description
The project is located along 2.8 miles of streets along Manchester Avenue (Vermont Avenue to South Broadway) and on South Broadway (Manchester Avenue to Imperial Highway) in South LA, Council District 8. This project will transform west Manchester Avenue and South Broadway into corridors of open space that are safer, more mobile, and sustainable. Project elements include: protected bike lanes, improved medians, pedestrian refuge islands, curb extensions, sidewalk improvements, upgraded access ramps, pedestrian signals, improved bus stops, implement shade trees, landscapes, and irrigation. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
Classifications
- NAICS238110
- PSCConstruction
Documents (14)
- M0015817_Info.pdfPDF156 KBNot yet available
- M0015817_Bid_Pkg_Part_2.zipZIP50.0 MBNot yet available
- M0015817_Bid_Pkg_Part_5.zipZIP25.4 MBNot yet available
- M0015817_Bid_Pkg_Part_4.zipZIP41.7 MBNot yet available
- M0015817_Bid_Pkg_Part_3.zipZIP41.4 MBNot yet available
- M0015817_Bid_Pkg_Part_7.zipZIP50.0 MBNot yet available
- M0015817_Bid_Pkg_Part_6.zipZIP50.0 MBNot yet available
- M0015817_Bid_Pkg_Part_1.zipZIP48.1 MBNot yet available
- M0015817_Addendum_1.pdfPDF203 KBNot yet available
- M0015817_ADDENDUM_2.zipZIP50.0 MBNot yet available
- M0015817_Addendum_3.zipZIP1.5 MBNot yet available
- M0015817_Addendum_4.zipZIP48.1 MBNot yet available
- M0015817_Addendum_5.zipZIP6.8 MBNot yet available
- M0015817_Addendum_6.zipZIP3.0 MBNot yet available
Contacts
Similar contracts
- B. Everett Jordan Concrete Pad InstallationDue Nov 4, 2026
- Concrete floor leveling and resurfacingDue Oct 26, 2026
- 2026-2027 Winter Shotcrete Repair at Eisenhower LockNew YorkDue Nov 4, 2026
- Construct Concrete TargetsFloridaDue Oct 14, 2026
- B. Everett Jordan Concrete Pad InstallationDue Nov 4, 2026
- Construct Concrete TargetsFloridaDue Oct 9, 2026