Bridge Repair Maintenance Group 2 (Re-Bid)
- Response deadline
- Dec 9, 2026 Due in 41 days
- Date posted
- Oct 29, 2026
- Source
- Open notice
Description
■ Only the following five Contractors can bid on this project as a Prime Contractor: • Calex Engineering • Clarke Contracting • Jilk Heavy Construction, Inc. • Mike Prlich & Sons, Inc. • Mladen Buntich Construction Company ▬ As a result of required maintenance inspections, the following were observed to have deficiencies: ♦ Sunnyslope Ave Pedestrian Bridge ♦ Coldwater Cyn & Burbank Blvd Bridge ♦ Doman AvePedestrian Bridge. The project will repair these deficiencies. Repairs include: ♦♦ concrete spalls ♦♦ cracks ♦♦ asphalt patching ♦♦ bridge railings ♦♦ timber bridge decks ♦♦ Any other incidental work required for the proper execution & completion of the job. This project is intended to restore the original functionality of the bridges & prevent further deterioration that could lead to future structural deficiencies. ▬▬▬▬▬ Note: The project scope has changed since the original bid ♦ See bid package for full scope & details ♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder ♦ For Bid Results visit http://engineering.lacity.gov/contractors/
Classifications
- NAICS237310
- PSCConstruction
Documents (2)
- E1909307_R_Project_Description.pdfPDF137 KBNot yet available
- E1909307_R_Bid_Pkg.zipZIP50.0 MBNot yet available
Contacts
Similar contracts
- WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4WashingtonDue Nov 4, 2026
- OK FW TSM 10(1) NFH Entrance Road and Parking ImprovementsOklahomaDue Nov 12, 2026
- TX FW LGA 10(5) Steve Thompson Wildlife DriveTexasDue Nov 3, 2026
- GAOA Brainard Lake Recreation Area Deferred MaintenanceColoradoDue Dec 17, 2026
- https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=c3f3ac29035e486d82fc2e72c96acb12GeorgiaDue Oct 30, 2026
- Y--GRSM 321788 - Oconaluftee River TrailDue Nov 12, 2026