Benner Street (5966) Pipe and Board
- Response deadline
- Oct 28, 2026 Due in 27 days
- Date posted
- Oct 1, 2026
- Source
- Open notice
Description
■ Only the following five Contractors can bid on this project as a Prime Contractor: • Calex Engineering • Clarke Contracting • Jilk Heavy Construction, Inc. • Mike Prlich & Sons, Inc. • Mladen Buntich Construction Company ▬ ♦ The project site is located on the south side of Benner Street in the Highland Park area of Los Angeles in a residential area approximately half a mile southwest of the intersection of York Boulevard and Figueroa Street. The sidewalk is exhibiting separation and uplift away from the curb for a length measuring approximately 45 linear feet, creating a gap as wide as 1.5 inches. The east edge of the sidewalk is also undermined 15 to 20 inches, creating a potential tripping hazard to pedestrian traffic. ♦ This project will mitigate the threat to public safety by constructing a new pipe and board retaining structure to restore lateral support to the sidewalk. The pipe and board will be 85 feet in length and 5 feet in height. The existing handrail will be removed and replaced. A portion of the sidewalk, curb, and gutter will also be removed and replaced. All proposed work is located within the public right of way. ▬▬▬▬▬ ♦ See bid package for full scope & details ♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder ♦ For Bid Results visit http://engineering.lacity.gov/contractors/
Classifications
- NAICS237310
- PSCConstruction
Documents (2)
- E1909498_Project_Description.pdfPDF131 KBNot yet available
- E1909498_Bid_Pkg.zipZIP18.5 MBNot yet available
Contacts
Similar contracts
- Sidewalk Replacement Throughout Lyons CampusDue Oct 14, 2026
- WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4WashingtonDue Nov 4, 2026
- Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
- Notice of Intent (NOI) to Sole Source for SAFB Taxiway Repairs at SAFB, ILIllinoisDue Oct 14, 2026
- Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest ServiceNew MexicoDue Oct 22, 2026
- CO NP BLCA 10(1) South Rim DriveColoradoDue Oct 8, 2026