la_rampla232125
Open
Avalon Boulevard Improvements Martin Luther King Jr Boulevard to 56Th Street (Vision Zero Program)
- Response deadline
- Nov 4, 2026 Due in 34 days
- Date posted
- Oct 1, 2026
- Source
- Open notice
Description
This project will incorporate Vision Zero safety elements such as upgraded crosswalk markings, traffic signal upgrades, signage, curb extensions, striping changes including bicycle lanes along the project alignment. The Vision Zero improvements are accompanied with improvements on pedestrian amenities including curb gutter, and sidewalk repair, installation of ADA curb ramps, and concrete bus pads. ▬ ● See bid package for full scope & details ●● Bid package only on RAMPLA- download Part 1 to be a planholder ● For planholders lists & bid results visit: http://engineering.lacity.gov/contractors/
Classifications
- NAICS237310
- PSCConstruction
Documents (4)
- ECS0132D_Info.pdfPDF131 KBNot yet available
- ECS0132D_Bid_Pkg_Part_3.zipZIP50.0 MBNot yet available
- ECS0132D_Bid_Pkg_Part_2.zipZIP50.0 MBNot yet available
- ECS0132D_Bid_Pkg_Part_1.zipZIP43.2 MBNot yet available
Contacts
Similar contracts
- Sidewalk Replacement Throughout Lyons CampusDue Oct 14, 2026
- WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4WashingtonDue Nov 4, 2026
- Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
- Notice of Intent (NOI) to Sole Source for SAFB Taxiway Repairs at SAFB, ILIllinoisDue Oct 14, 2026
- Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest ServiceNew MexicoDue Oct 22, 2026
- CO NP BLCA 10(1) South Rim DriveColoradoDue Oct 8, 2026