5064(078) Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP) [CIP No. 73323]
- Response deadline
- Dec 3, 2026 Due in 27 days
- Date posted
- Nov 5, 2026
- Source
- Open notice
Description
The City of Pasadena, in coordination with the California Department of Transportation (Caltrans), proposes to rehabilitate and seismically retrofit the existing two-lane Holly Street Bridge (No. 53C1041) over the Arroyo Seco Channel, the Arroyo Seco Trail (a Class 1 multi-use trail), and North Arroyo Boulevard. The project includes seismic retrofit and comprehensive bridge rehabilitation work including deck treatment, repair of spalled concrete, and rehabilitation of bridge girders with exposed reinforcing steel to address identified structural deficiencies and extend the service life of the facility. In addition, the project includes upgrades to bring adjacent pedestrian facilities (sidewalk, curb and gutter, and new curb ramps) into compliance with current Americans with Disabilities Act (ADA) standards, specifically at the intersection of Linda Vista Avenue and Holly Street. The project is funded by the Federal Highway Administration (FHWA) through the Highway Bridge Program (HBP), authorized by United States Code (U.S.C.) Title 23 and administered by Caltrans. The Contractor is required to comply with all applicable federal, state, and local laws, regulations, and requirements associated with federally funded projects.
Documents
No documents posted for this opportunity.
Similar contracts
- CDBG Sidewalk Improvement Project FY 2027CADue Nov 20, 2026
- Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027CADue Nov 20, 2026
- Installation of Street Lighting on Raymond Avenue from Maple Street to North City LimitsCADue Nov 17, 2026
- HSIP Cycle 11 Pedestrian Crossing EnhancementsCADue Nov 19, 2026
- On-Call Labor Compliance ServicesCADue Nov 18, 2026
- Construction Management for Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP)CADue Oct 29, 2026