Civic AI
Civic AI
Procurement intelligence
California eProcure0000040329
Open

West Perimeter Bridge

Response deadline
Oct 20, 2026
Due in 19 days
Date posted
09/10/2026  9:35AM PDT

Description

Contractor shall provide all necessary materials, supplies, tools, equipment, transportation, licenses, permits, prevailing wages, insurance, bonds, and personnel/labor to complete the replacement of the existing West Perimeter Vehicle Bridge at DSH Patton in conformity with the Drawings and Specifications hereinafter identified. Work shall include demolition and removal of the existing bridge structure and associated site elements, installation of a new vehicle bridge, construction of ADA-compliant warning curbs as indicated on the contract drawings, removal and relocation/protection of existing water lines as required, and reconstruction of pavement and approach transitions on both sides of the bridge to achieve proposed grades.

Classifications

  • UNSPSC72154012Special trade construction & maint srvcs - Specialty building & trades srvcs - Concrete forms erection & dismantling

Documents (4)

  • event-package-0000040329
    Not yet available
  • West_Perimeter_Bridge,_DSH-P_-_OSFM_Approved_Specifications.pdf
    632 KBNot yet available
  • P24-00061_-_IFB_26-30612-000_-_PROJECT_MANUAL.pdf
    5.6 MBNot yet available
  • West_Perimeter_Bridge,_DSH-P_-_OSFM_Approved_Drawings.pdf
    9.9 MBNot yet available

Contacts

Similar contracts

Explore more