BKTZ242007 118th Wing B720 Repair Emergency Power
- Response deadline
- Sep 2, 2026 Due in 37 days
- Date posted
- Jul 27, 2026
- Source
- Open notice
Description
Due to technical error, this solicitation is in response to Pre-Solicitation Notice W50S9726BA001PROJECT TITLE: B720 GENERATOR REPAIRPROJECT LOCATION: BERRY FIELD AIR NATIONAL GUARD BASE NASHVILLE, TNPROJECT TITLE: B720 REPAIR EMERGENCY POWERPROJECT LOCATION: NASHVILLE, TN 37217CONSTRUCTION CONTRACT FOR PROJECT BKTZ242007 REPAIR EMERGENCY POWER, AT THE 118TH WING, BERRY FIELD AIR NATIONAL GUARD BASE, NASHVILLE, TN 37217. WORK SHALL BE PERFORMED IN ACCORDANCE WITH (IAW) THE PLANS AND SPECIFICATIONS. THIS PROJECT IS SET ASIDE FOR SMALL BUSINESSES. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 238210 AND THE SMALL BUSINESS SIZE STANDARD IS $19,000,000.00 IN AVERAGE ANNUAL RECEIPTS FOR THE PAST THREE YEARS. CONSTRUCTION PROJECT MAGNITUDE IS BETWEEN $250,000 AND $500,000. PERSONS INTENDING TO SUBMIT A BID ARE STRONGLY ENCOURAGED TO ATTEND THE PRE-BID CONFERENCE SITE VISIT. SEE SECTION 00 21 00 FOR LOCATION AND DATE.AWARD WILL BE MADE TO THE RESPONSIBLE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS AND IS MOST ADVANTAGEOUS TO THE GOVERNMENT WILL CONSIDER ONLY PRICE AND PRICE RELATED FACTORS. THE GOVERNMENT INTENDS TO AWARD WITHOUT DISCUSSIONS. OFFERORS SHALL SUBMIT BIDS IN RESPONSE TO THIS SOLICITATION ELECTRONICALLY VIA THE SOLICITATION MODULE OF THE PROCUREMENT INTEGRATED ENTERPRISE ENVIRONMENT (PIEE) WEBSITE AT HTTPS://PIEE.EB. MIL. NO OTHER TRANSMISSION METHODS (E-MAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- jonathan.forren@us.af.mil6156608889
Similar contracts
- J061--Building 65 Electrical Switch 1 RepairDue Aug 3, 2026
- Large-Tier Electrical Construction IDIQMDDue Aug 12, 2026
- B1043 Install Backup GeneratorNMDue Aug 12, 2026
- 22 MXS - Power Pitts & Jet Power Unit Troubleshooting - McConnell AFBKSDue Aug 11, 2026
- Residential Electrical Distribution and backup power system upgrade for U.S. Embassy Quito at Government Owned Residential compound ZibaEC-PDue Sep 4, 2026
- Fiber Optic Cable InstallationTXDue Aug 7, 2026