Replacement of the Outdated Fire Alarm System, Curtius Annex, U.S. Embassy Berlin, Germany
- Response deadline
- Sep 21, 2026 Due in 3 days
- Date posted
- Sep 18, 2026
- Source
- Open notice
Description
**Amendment 0001 (A0001) with questions and answers *9/1/26 SF1449 + reminder: site visitors kindly requested to arrive 15 minutes early. The Contractor shall replace the current, outdated fire panel and alarm system in its entirety, including the existing malfunctioning system, and shall extend coverage to include the workshop area of the building, which is not currently served by the system. The present system is outdated and has reached the end of its service life. The new system must be compatible with existing building infrastructure and any future planned upgrades. All materials and installations must conform to Department of State (DoS) standards and applicable local building codes. The new system shall match or exceed the performance of the existing system to ensure seamless integration and long-term reliability.
Classifications
Documents (11)
- 26Q0037 Attach02 Price Curtius Annex.pdf.pdf74 KBNot yet available
- 19GE5026Q0037-combined-synopsis-solicitation.pdf.pdf512 KBNot yet available
- 26Q0037 Attach03 Drawings CurtiusFireAlarm.pdf.pdf1.4 MBNot yet available
- 26Q0037 Attach07 PastPerformance.pdf.pdf311 KBNot yet available
- 19GE5026Q0037-0001-QAs22.pdf.pdf225 KBNot yet available
- 19GE5026Q0037-0001-signed.pdf.pdf165 KBNot yet available
- 26Q0037 Attach04 W14.pdf.pdf73 KBNot yet available
- 26Q0037 Attach05 W14 Instructions.pdf.pdf152 KBNot yet available
- 26Q0037 Attach06 TCN.pdf.pdf220 KBNot yet available
- 26Q0037 Attach01 SOW_CurtiusFireAlarm.pdf.pdf376 KBNot yet available
- 19GE5026Q0037-SF1449.pdf.pdf31 KBNot yet available
Contacts
Similar contracts
- DC Battery Replacement/DisposalNew MexicoDue Sep 23, 2026
- Fiber Optic Network RebuildColoradoDue Sep 21, 2026
- Exhaust TroubleshootingNew MexicoDue Sep 23, 2026
- MSANG CRTC 125kW Generator and ATSMississippiDue Sep 21, 2026
- Chapel Sound System Upgrade and Maintenance, Gricignano Support SiteCampaniaDue Sep 22, 2026
- Air Compressor RelocationDistrict of ColumbiaDue Sep 23, 2026