Beach Nourishment Great Egg Harbor Inlet and Peck Beach
- Response deadline
- May 26, 2026 Closed
- Date posted
- May 18, 2026
- Source
- Open notice
Description
The purpose of Amendment 0001 to Solicitation W912BU26BA024 is as follows: a.) Provide answers to the RFIs submitted b.) Adds Contract Line-Item Number (CLIN) 0005 for Structures Monitoring. c.) Incorporates the updated Statement of Work (SOW) into Section 00 00 0 d.) Increases the quantity for CLIN 0006 (Option 1 - Beachfill) from 250,000 to 375,000 Cubic Yards (CY). e.) Revises DFARS 252.236-7001 (Contract Drawings and Specifications) to include updated Specification Section 01 11 00, which reflects revised language for the sequence of work. f.) Updates FAR Provision 52.252-3 (Alterations in Solicitation). g.) Incorporates FAR 52.222-90 (Addressing DEI Discrimination by Federal Contractors) PURPOSE: The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for the beach nourishment of Great Egg Harbor Inlet and Peck Beach, Cape May County, New Jersey DESCRIPTION: The contractor will conduct pre-placement condition surveys and pump/place approximately 911,000 CY of sand from the Great Egg Harbor Inlet borrow area (roughly 5,000 feet offshore) onto the beaches of Ocean City, New Jersey from the Seaview Road groin to approximately 14th Street.? Quantity options of 50,000 CY, 91,000 CY, 182,000 CY, and 250,000 CY will be included to place more sand depending on bid prices received and sand need. Sand must come from the offshore borrow area. Trucking in sand will not be permitted under this contract. DISCLOSURE OF MAGNITUDE OF THE PROPOSED CONSTRUCTION PROJECT: $20,000,000 and $40,000,000. NAICS CODE AND SBA SIZE STANDARD: 237990, OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION, Size Standard $45.0M. PERIOD OF PERFORMANCE: 96 Calendar Days from the Notice to Proceed (NTP).SYSTEM FOR AWARD MANAGEMENT (SAM): Bidders are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Bids must be submitted in PIEE Solicitation Module. ADDITIONAL INFOMRATION: Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is and will continue to be the responsibility of all potential Bidders to monitor the SAM.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be maintaining a mailing list.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Webbers Falls Excitation System ReplacementsDue Oct 23, 2026
- GIWW Freeport to Matagorda Maintenance DredgingDue Oct 19, 2026
- 2027-2029 Maintenance Dredging, Anchorage Harbor, AlaskaAlaska
- Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020Due Nov 6, 2026
- GAOA Kents Lk. CG Reconstruction, Fishlake NF, UtahUtahDue Oct 28, 2026
- Fall River Lake and Dam Damsite Park Lagoon RepairDue Oct 20, 2026