Barren River Lake Repair Drainage Ditch at Tailwater Stilling Basin
- Response deadline
- Sep 11, 2026 Closed
- Date posted
- Aug 26, 2026
- Source
- Open notice
Description
Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinThe contractor���������������������������������������������������������������������������������s work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will shall begin within 10 calendar days of Notice to Proceed and must conclude 180 calendar days after Notice to Proceed.Location:United States Corps of EngineersBarren River Lake11088 Finney RdGlasgow, KY 42141This procurement is 100% set-aside for Small Business, NAICS 238910, Size Standard $19M.Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.Note: The contract award will be based on lowest total price to the Government.** Bid Bonds are required and must be provided at the same time of your submission. **A site visit is highly recommended, Contractors are encouraged to attend a site visit to review the complexities of the work site, verify existing conditions, and exact measurements. The site visit is scheduled for 8 September 2026, 0900 CT. Please reach out to Ryan Weaver at 270-646-2055 or Ryan.A.Weaver@usace.army.mil to confirm your attendance.Quotes are due 11 September 2026, 12:00PM Eastern Time.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Shirley Creek Campground ImprovementsIndianaDue Oct 20, 2026
- Shirley Creek Campground ImprovementsIndianaDue Oct 20, 2026
- Raystown Lake Project in Pennsylvania-Equipment Rental with OperatorsDue Oct 14, 2026
- Pre-Solicitation Notice - Trenching, Conduit and Ground-well InstallationSaint AndrewDue Oct 26, 2026
- Shirley Creek Campground ImprovementsIndianaDue Oct 14, 2026
- Raystown Lake Project in Pennsylvania-Equipment Rental with OperatorsDue Oct 13, 2026