Baku Office Building Chancery Roof Replacement
- Response deadline
- Aug 24, 2026 Due in 8 days
- Date posted
- Jul 22, 2026
- Source
- Open notice
Description
***Amendment 02 - Add Attachment 7 - Authorized Baku Hotels and Rates for 2026 and Attachment 8 - TDY Briefing. The offeror is required to review Attachment 8, sign page 7, and bring the signed form to the site visit*** ***Amendment 01 - Correct the reference in L-003, Factor 1 from Design/Build to Design-Bid-Build*** This is the formal Request for Proposal (19AQMM26R0293) for the OBC Roof Replacement at the US Embassy in Baku, Azerbaijan. The pre-proposal site visit is scheduled for August 5-7. Questions are due no later than August 14, 2026 by Close of Business. *Potential offerors are required to attend the pre-proposal site visit in order for their proposals to be considered for award.* See the Attachments/Links tab for the RFP and associated documents. *The drawings are a controlled item and a verification of the requestor's profile will be verified before approving the request to access the drawings.*
Classifications
Documents (11)
- Attachment 3 - PPQ.docx.docx27 KBNot yet available
- 19AQMM26R0293.pdf.pdf251 KBNot yet available
- Attachment 5 - Bidders DD-254.pdf.pdf613 KBNot yet available
- 19AQMM26R0293 A001.pdf.pdf125 KBNot yet available
- 19AQMM26R0293 A002.pdf.pdf51 KBNot yet available
- Attachment 8 - TDY Briefing.pdf.pdf429 KBNot yet available
- Attachment 6 - Public Release of Information 20250219.pdf.pdf317 KBNot yet available
- Attachment 4 - Price Sheet.xlsx.xlsx17 KBNot yet available
- Attachment 1 - OBC Roof Replacement Specifications.pdf.pdf861 KBNot yet available
- Attachment 2 - OBC Roof Replacement Drawings.pdf.pdf11.9 MBNot yet available
- Attachment 7 - Authorized Baku Hotels and Rates for 2026.pdf.pdf293 KBNot yet available
Contacts
Similar contracts
- Roof Repairs - National Center for Cool and the Cold-Water Aquaculture (NCCCWA)West VirginiaDue Aug 17, 2026
- Air Traffic Control Tower & Base Building Waterproofing & Exterior Restoration ProjectFloridaDue Sep 8, 2026
- Roof Repair B9502 McGregor RangeTexasDue Aug 26, 2026
- Removal, Inspection, & Replacement Roofing - 3 remote Forest Service locationsArizonaDue Sep 10, 2026
- Free Quaker Meeting House, Roof Repair, ConservatiDue Sep 11, 2026
- Gold Beach Ranger Station Roof ReplacementsOregonDue Aug 28, 2026