SAM.govW50S7X26BA003
Open
B16 PLC Replacement
- Response deadline
- Jul 24, 2026 Closed
- Date posted
- Jun 23, 2026
- Source
- Open notice
Description
Inspect, troubleshoot, and repair or replace generator PLC controls. The contractor is to subcontract with the designated OEM regional Representative of kohler to troubleshoot and repair PLC to original installation parameters and complete option line item to install a Hot Switch Bypass, if awarded.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- joshua.kingori.2@us.af.mil3167597590
Similar contracts
- 541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC ClevelandOhioDue Oct 30, 2026
- Edwards AFB Holiday Light & Decor InstallationCaliforniaDue Nov 2, 2026
- Black Rock Lock High Mast Lighting ProjectDue Oct 28, 2026
- Generator Inspection Service and Routine Maintenance
- FY27 Remove/Install Two (2) Commercial-Grade Laser/LED ProjectorsDue Nov 4, 2026
- Upgrade Fire Detection System at FDC Honolulu, HawaiiHawaiiDue Nov 4, 2026