B--Gusg Habitat Hydro-Logic Restoration 202
- Response deadline
- Sep 14, 2026 Due in 4 days
- Date posted
- Sep 10, 2026
- Source
- Open notice
Description
GUSG HABITAT HYDRO-LOGIC RESTORATION 2026 AMENDMENT 1 09/10/2026- This amendment is to reopen and extend the due date to 09/14/2026 12pm (noon) MD. This is a construction contract to treat habitat for Gunnison sage-grouse, a species listed as endangered under the Endangered Species Act (ESA). The goal of this project is to improve drainage on rural roads on government lands in the Crawford, Colorado area by installing efficient drainage features that effectively transport surface water off of roadways and onto adjacent sagebrush vegetation, effectively rewatering the landscape in a way that mimics natural hydrologic flow. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the government.
Classifications
Documents (5)
- Sol_140L1726R0010_Amd_0001.pdf.pdf204 KBNot yet available
- Sol_140L1726R0010.pdf.pdf407 KBNot yet available
- A06_-_140L1726R0010_-_Map.pdf.pdf1.7 MBNot yet available
- B03_-_140L1726R0010_-_Wage_Rate.pdf.pdf174 KBNot yet available
- A05_-_140L1726R0010_-_Statement_of_Objectives.pdf.pdf6.6 MBNot yet available
Contacts
Similar contracts
- JP Murtha Float Mooring Bitts Retrofit
- Z--C&O Canal National Historical Park - Fy26 Repair IDue Sep 18, 2026
- P110 Cape Canaveral Railhead and Transfer Facilities at Kennedy Space Center, FloridaFloridaDue Sep 25, 2026
- DeLong Pier RepairDue Sep 25, 2026
- Y--Conconully Dam, WA, Safety of Dams ModificationWashingtonDue Sep 30, 2026
- P110 Cape Canaveral Railhead and Transfer Facilities at Kennedy Space Center, FloridaFloridaDue Sep 25, 2026