SAM.gov36C77026R0006
Open
Correct FCA Deficiencies Construction -Amendment
- Response deadline
- Aug 16, 2026 Closed
- Date posted
- Jul 9, 2026
- Source
- Open notice
Description
Correct FCA Deficiencies Construction - Solicitation The contractor shall be responsible for all aspects of the project and each phase shall be subject to VA approval at designated project milestones. This project includes (but not limited to) all labor, materials, supplies, equipment, services, training, lighting, communications, security, operation and maintenance manuals, as built drawings, permits (if necessary), construction, installation, and commissioning.
Classifications
Documents (11)
- 36C77026R0006 0002.pdf.pdf84 KBNot yet available
- DownloadAttachment 1 - Past Performance 36C77026R0006.docx.docx29 KB
- DownloadPUBLIC 36C77026R0006 0002.pdf.pdf84 KB
- Download03a - 762-24-101 FCA Drawings.pdf.pdf34.6 MB
- DownloadSPECIFICATIONS.pdf.pdf5.8 MB
- Download03d - 762-24-101 FCA Geotech.pdf.pdf4.8 MB
- Download36C77026R0006 0003.pdf.pdf1.4 MB
- DownloadDAVIS BACON - TUCSON 1-2-26.pdf.pdf69 KB
- Download36C77026R0006_2.docx.docx143 KB
- Download03c - 762-24-101 FCA Topo.pdf.pdf972 KB
- Download36C77026R0006 000115 MAY.docx.docx114 KB
Contacts
- Contract Specialistbillie.cherico@va.gov(913)758-9930
Similar contracts
- FRC Ground Level HVAC and Roof ReplacementTexasDue Sep 9, 2026
- 573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMCFloridaDue Sep 9, 2026
- Replacement of Conference Room, and Command Suite WindowsAlaskaDue Sep 9, 2026
- FCI Seagoville Hot Water Generator ReplacementTexasDue Sep 16, 2026
- MAHG 17-1095 Stennis HallMississippiDue Sep 9, 2026
- Z--DENA 332037 Eielson Roof ReplacementDue Oct 1, 2026