Prescott National Forest Fire Center Ramp Reseal and Crack Repair
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
This project consists of providing all materials, equipment, labor, transportation, mobilization/demobilization, and incidentals for crack sealing and applying Fog Seal (emulsified asphalt seal coat) to the asphalt at the Prescott Fire Center airtanker base/ light fixed wing ramp and helibase. Before Fog Seal is applied, all existing asphalt and concrete tarmac markings on the airtanker base ramp and helibase will require Hydro Blasting to completely remove all markings and striping. Before removing all markings and striping, contractors are encouraged to take photos and dimensions of all existing markings and striping. Note: The Contractor shall be responsible for accurate field measurements all striping and markings before their replacement. All replaced striping and markings
Classifications
Documents (1)
- 12363N26Q4207 RFQ---.pdf.pdf2.4 MBNot yet available
Contacts
Similar contracts
- WSMR Bridge Repair RR7B0003New MexicoDue Sep 8, 2026
- Improve Hamat RunwayDue Sep 14, 2026
- ZTL Childcare Facility Paving ProjectGeorgiaDue Sep 10, 2026
- Repair of Sergeant Major Boulevard at Fort Bliss, Texas.Due Sep 15, 2026
- Multiple Trail Bridges Replacement Project Phase 2GeorgiaDue Sep 8, 2026
- GOGA 319407 - Bridge PreservationDue Sep 14, 2026