Civic AI
Civic AI
Procurement intelligence
SAM.govW912DY26RA107
Open

PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona

DEPT OF DEFENSE · AZ
Response deadline
Jul 27, 2026
Due in 9 days
Date posted
Jul 15, 2026

Description

The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled.

Classifications

Documents (14)

  • B0914-1.pdf
    .pdf38 KBNot yet available
  • B0500.pdf
    .pdf86 KBNot yet available
  • B1060 BOQ AS-BUILTS 1958.pdf
    .pdf17.2 MBNot yet available
  • Attachment 1 PWS FY26 USMC Yuma AZ Pre-Demo Survey.pdf
    .pdf314 KBNot yet available
  • BEQ 913_As builts.pdf
    .pdf38.2 MBNot yet available
  • B0914-2.pdf
    .pdf28 KBNot yet available
  • JET ENGINE TEST CELL B310 AB.pdf
    .pdf148.1 MBNot yet available
  • B0660.pdf
    .pdf144 KBNot yet available
  • Solicitation Amendment - W912DY26RA1070001 Professional Appearance.pdf
    .pdf2.8 MBNot yet available
  • B662.pdf
    .pdf33.6 MBNot yet available
  • Attachment 2_FY26_Yuma Proving Ground (Survey)_Price Spreadsheet.xlsx
    .xlsx14 KBNot yet available
  • B0914-3.pdf
    .pdf34 KBNot yet available
  • Solicitation - W912DY26RA107 Professional Appearance.pdf
    .pdf2.8 MBNot yet available
  • B0661.pdf
    .pdf188 KBNot yet available

Contacts

Explore more