SAM.govW912DY26RA107
Open
Pre-Demolition Survey of Various Buildings, Marine Corps Air Station, Yuma, Arizona
DEPT OF DEFENSE · AZ
- Response deadline
- Jul 22, 2026 Due in 3 days
- Date posted
- Jul 9, 2026
- Source
- Open notice
Description
The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components.
Classifications
Documents (14)
- B0914-1.pdf.pdf38 KBNot yet available
- B0500.pdf.pdf86 KBNot yet available
- B1060 BOQ AS-BUILTS 1958.pdf.pdf17.2 MBNot yet available
- Attachment 1 PWS FY26 USMC Yuma AZ Pre-Demo Survey.pdf.pdf314 KBNot yet available
- BEQ 913_As builts.pdf.pdf38.2 MBNot yet available
- B0914-2.pdf.pdf28 KBNot yet available
- JET ENGINE TEST CELL B310 AB.pdf.pdf148.1 MBNot yet available
- B0660.pdf.pdf144 KBNot yet available
- Solicitation Amendment - W912DY26RA1070001 Professional Appearance.pdf.pdf2.8 MBNot yet available
- B662.pdf.pdf33.6 MBNot yet available
- Attachment 2_FY26_Yuma Proving Ground (Survey)_Price Spreadsheet.xlsx.xlsx14 KBNot yet available
- B0914-3.pdf.pdf34 KBNot yet available
- Solicitation - W912DY26RA107 Professional Appearance.pdf.pdf2.8 MBNot yet available
- B0661.pdf.pdf188 KBNot yet available
Contacts
- TYRONE M. BROWNtyrone.m.brown@usace.army.mil25698951918
- Christy N. Tallantchristy.n.tallant@usace.army.mil256-895-5238