PRC Airport Hangar Development Phase 1
- Response deadline
- Dec 10, 2026 Due in 40 days
- Date posted
- Oct 30, 2026
- Source
- Open notice
Description
The Prescott Regional Airport (PRC) is soliciting for construction of an Executive Hangar Development. The project will consist of a 4-unit, 16,315 square foot hangar development project. The hangar shall be a pre-engineered steel building. The pre-engineered steel building will be based upon architectural performance specifications and not a single-source steel manufacturer. The hangar shall have a water fire suppression system along with interior floor drains with 1,500 gallon oil and water separator. Civil site improvements consists of grading, drainage, utilities, aircraft taxi lane pavement and security fencing. Also included is a concrete aircraft wash rack with water and drainage improvements.
Documents
No documents posted for this opportunity.
Similar contracts
- Hangar LED RetrofitAZDue Sep 3, 2026
- Airport Taxiway "F" Realignment Phase 1AZDue Sep 24, 2026
- Lease of Airport Hangar at 6543 Crystal LaneAZDue Jul 23, 2026
- Airport Hangar Development Phase 1AZDue Aug 13, 2026