Multi-tank water softener system and installation
- Response deadline
- Aug 4, 2026 Closed
- Date posted
- Jul 27, 2026
- Source
- Open notice
Description
1 each – Twin Tank Water Softener System to include associated plumbing supplies, labor, installation, and deliver. Justification The existing water softener brine tank at Phoenix Indian Medical Center has reached the end of its service life and requires replacement with a new system to ensure continued safe and reliable operation. Due to age-related deterioration, the current tank is increasingly susceptible to structural weakness, sludge accumulation, salt bridging, inefficient regeneration, and potential bacterial growth, all of which compromise softening efficiency and system reliability. Replacing the tank is necessary to maintain consistent water quality, protect critical hospital equipment, prevent unplanned downtime, and support uninterrupted patient care operations.
Classifications
Documents (1)
- Combined Synopsis.pdf.pdf325 KBNot yet available
Contacts
Similar contracts
- Food Equipment for Camp PendletonCaliforniaDue Oct 23, 2026
- Purchase of Vehicle Maintenance Equipment for KSC Truck CompanyDue Oct 16, 2026
- Equipment IST - FTRDDue Oct 30, 2026
- Truck, Lift, WheelDue Oct 14, 2026
- Filter Assembly, WatDue Oct 13, 2026
- https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=cbb97ad04b9a4f36b391ddf98feabbdcDue Oct 13, 2026