OpenGov / Ionwave2026-NIBCONST-594
Open
FY27 Inert Crushing at Transfer Station
- Response deadline
- Oct 1, 2026 Due in 26 days
- Date posted
- Sep 4, 2026
- Source
- Open notice
Description
The City of Prescott Transfer Station located at 2800 Sundog Ranch has two inert materials stockpiles to be crushed and screened. One stockpile is a mixture of asphalt concrete, concrete, and rubble. The second material stockpile is a mixture of concrete and inert materials. The project generally consists of crushing and screening both stockpiles into 1-¼ inch minus material and stockpiling on site.
Documents
No documents posted for this opportunity.
Similar contracts
- South Tank Pipe Relining ProjectAZDue Oct 1, 2026
- Sundog Trunk Main Sewer Phase C3AZDue Oct 1, 2026
- Citywide Water Main Replacement Phase 2AZDue Oct 1, 2026
- Utility Locating Services (Arizona BlueStake)AZDue Sep 24, 2026
- Water and Wastewater Works MaterialsAZDue Sep 17, 2026