Fiber Optic Install on the Apache-Sitgreaves, NF
- Response deadline
- Jul 17, 2026 Due in 0 days
- Date posted
- Jul 7, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX26Q0005 is issued as a Request for Quotation (RFQ) for upgrading telecommunications infrastructure at ten sites on the Apache-Sitgreaves National Forests in Eastern Arizona. The project is located on the Alpine, Black Mesa, Clifton, Lakeside, & Springerville Ranger District. (6) Sites require Cat 6 cabling for future Wireless Access Points (WAP), (5) sites require fiber optic cable to extend the network to other buildings, (4) sites have a single small building without any prior IT infrastructure that requires secure housing for network equipment and associated IT infrastructure. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238210, Electrical Contractors and Other Wiring Installation Contractors. The small business size standard is $19M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Amendment 001 - extends solicitation close date Amendment 002 - provides responses to RFI's 001-026, site visit attendee list, office floor plans (7), extends solicitation close
Classifications
Documents (20)
- DownloadAttachment 1 - SOW Telecom Upgrades Rev2.docx.docx4.4 MB
- Download127EAX26Q0005 0001.pdf.pdf84 KB
- DownloadAttachment 7 - WD AZ20260043 Mod 1 Coconino County.pdf.pdf36 KB
- Download127EAX26Q0005 0002.pdf.pdf152 KB
- DownloadAttachment 17 Lakeside RS Site.pdf.pdf525 KB
- DownloadAttachment 16 Lakeside Office Floor Plan.pdf.pdf298 KB
- DownloadAttachment 9 RFI Log w Responses 001-026 - 127EAX26Q0005.docx.docx29 KB
- DownloadAttachment 15 Clifton Office.pdf.pdf76 KB
- DownloadAttachment 5 - WD AZ20260027 Mod 2 Navajo County.pdf.pdf38 KB
- DownloadAttachment 8 - Pre-Bid Site Visit Itinerary.pdf.pdf39 KB
- DownloadAttachment 2 - SOI Telecom Upgrades Rev2.docx.docx18 KB
- DownloadAttachment 6 - WD AZ20260029 Mod 1 Greenlee County.pdf.pdf38 KB
- DownloadAttachment 10 Site Visit Sign In Sheets.pdf.pdf3.8 MB
- DownloadAttachment 14 BMRS_FLOOR_PLAN.pdf.pdf297 KB
- Download127EAX26Q0005 SF1442.pdf.pdf1.1 MB
- DownloadAttachment 13 BMRS_ANNEX.pdf.pdf197 KB
- DownloadAttachment 4 - WD AZ20260022 Mod 2 Apache County.pdf.pdf38 KB
- DownloadAttachment 11 Alpine Office.pdf.pdf146 KB
- DownloadAttachment 12 ASNF SO.pdf.pdf216 KB
- DownloadAttachment 3 - Specifications.docx.docx98 KB
Contacts
- Richard Ortega