644-25-039 | Plumbing Infrastructure Repairs Building 1, 8, and Exterior | Phoenix, AZ
- Response deadline
- May 28, 2026 Closed
- Date posted
- Apr 27, 2026
- Source
- Open notice
Description
The Design-Build contractor shall provide all site investigations, design analysis, design, design specifications and drawings, construction documents, materials, labor, equipment, supervision, testing, shop and manufacturing drawings, submittals, submittal registry/index, and construction to perform the requirements of this project in accordance with this SOW. This project is to replace existing sewer and vent piping that has failed/deteriorated along with heat exchangers, steam piping, condensate pipe, associated valves and traps, and tank systems. The project, at minimum, will consist of replacing failed sewer lines and vents for the basement of buildings 1, basement of building 8 and on the campus grounds with other equipment associated to waste and heat exchanger equipment, associated pipe, valves, traps, insulation, strainers, controls etc.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Request for Information – Four FY24 Design-Build to Budget Projects; Fort Shafter, HMR, Schofield Barracks and Schofield Barracks East RangeHawaiiDue Nov 11, 2026
- Y--East Canal Efficiency ImprovementsDue Nov 20, 2026
- New Meadows Range BarnIdahoDue Nov 29, 2026
- Kelly Pierson OSSWashingtonDue Nov 30, 2026
- Hydrant Repair/Replacement, Midewin National Tallgrass PrairieIllinoisDue Nov 16, 2026
- Y--GRTE 237343 - Rehab 4 Lazy F RanchDue Nov 21, 2026