Civic AI
Civic AI
Procurement intelligence
SAM.gov19AU9026Q0015
Open

Upgrade Generator Control System

STATE, DEPARTMENT OF · AT-9
Response deadline
Aug 6, 2026
Due in 19 days
Date posted
Jul 1, 2026

Description

The upgrade of the generator control system consists of, but is not limited to the following: Execution planning Decommissioning, Removal and disposal of existing generator control system Disconnection, removal and disposal of existing ACON Generator control system ​​​​​​Delivery, installation and commissioning of new generator control system​​​ Delivery (HW & SW), installation and connection of new DSE 8620MKII (or equal) control system The Contractor guarantees spare parts availability (software and hardware components) for a minimum of 10 years. Commissioning, test run Customer training/documentation ​​​​​​​​​​​​​​​​​​​​Under the contract the contractor assumes full and unlimited responsibility for the right choice and correct workmanship of flawless material as well as for proper and professional completion. Regulations/standards incl. electro- technical safety regulations: ÖNORM B 2110 General terms for construction work ETG 1992 electrical engineering law ÖVE/ÖNORM- E 8101 ÖVE/ÖNORM- E 8015-1-3 ÖVE/EN 1 DIN German industrial standards VDI guidelines Upgrade MTU 500kVA- Generator Control system- work must be scheduled for a weekend between Fr, 5pm until Su, 7pm. Generator downtime must be always kept to a minimum. Planned Execution period: Ocotober 2026

Classifications

Documents (4)

  • 19AU9026Q0015_Solicitation_doc.pdf
    .pdf355 KBNot yet available
  • 19AU9026Q0015_Attachment_A_SOW.pdf
    .pdf364 KBNot yet available
  • 19AU9026Q0015_SF1449.pdf
    .pdf1.1 MBNot yet available
  • 19AU9026Q0015_Coverltr.pdf
    .pdf581 KBNot yet available

Contacts

Explore more