Purchase of Culvert Materials for Ouachita National Forest, Arkansas
- Response deadline
- Aug 16, 2026 Closed
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
*see attachment I. STATEMENT OF WORK (SOW) This project consists of supplying culverts to the Ouachita National Forest for installation by forest service employees on an as needed basis. Contractor shall supply the following: 40 – 18” diameter, 30’ length, 16ga aluminized type 2 culverts 20 – 24” diameter, 30’ length, 16ga aluminized type 2 culverts 10 – 30” diameter, 30’ length, 16ga aluminized type 2 culverts 10 – 36” diameter, 36’ length, 16ga aluminized type 2 culverts 10 – 18” diameter, aluminized type 2 culvert bands 4 – 24” diameter, aluminized type 2 culvert bands 4 – 30” diameter, aluminized type 2 culvert bands 4 – 36” diameter, aluminized type 2 culvert bands POLYMERIC COATED CORRUGATED STEEL PIPE MAY BE SUBSTITUTED FOR ALUMINUM COATED, TYPE 2 CORRUGATED STEEL PIPE AND WILL BE CONSIDERED AS EQUAL FOR PAYMENT. WHERE POLYMERIC COATED PIPE IS USED, THICKNESS OF COATING SHALL BE 10 MILS INSIDE AND 10 MILS OUTSIDE. ALL EXPOSED METAL OR AREAS OF PIPE WHERE POLYMERIC OR ALUMINUM COATING IS DAMAGED SHALL BE PAINTED WITH A ZINC DUST-ZINC OXIDE POWDER CONFORMING TO FEDERAL SPECIFICATION TT-P-641 OR MIL-P-21085 AND A TWO COMPONENT EPOXY PAIN, "SCOTCH CLAD", 2M, PPG OR EQUAL. DELIVERY FOB LOCATION: OUACHITA NATIONAL FOREST 295 SEED ORCHARD ROAD MT ISA, AR 71957 Period of Performance: 08-17-2026 thru 11-30-2026 - 90 Day ARO
Classifications
Documents (1)
- DownloadC04_Solicitation Template _12444026Q0168.pdf.pdf701 KB
Contacts
Similar contracts
- Notice of Intent (NOI) to Sole Source for SAFB Taxiway Repairs at SAFB, ILIllinoisDue Oct 14, 2026
- CO NP BLCA 10(1) South Rim DriveColoradoDue Oct 8, 2026
- Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest ServiceNew MexicoDue Oct 22, 2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementOregonDue Oct 8, 2026
- Sidewalk Replacement Throughout Lyons CampusDue Oct 9, 2026
- Airfield Civil Works IDIQDue Oct 5, 2026